What should I pay attention to when arranging PPR pipes in a balanced way?

Update:2021-12-24
Abstract:For the needs of diversified life and various applications, PPR pipelines are also various, such as underground PPR pipeline network, underground powe...
For the needs of diversified life and various applications, PPR pipelines are also various, such as underground PPR pipeline network, underground power grid, gas pipeline network, water pipeline network, heating pipeline and so on. In this way, there are a lot of considerations when piping layout, and the importance of balanced layout needs to be paid attention to.

1. Once the PPR pipeline, especially the buried pipeline, is buried in the ground, the original design should be respected as much as possible, and the modification should be as little as possible. If it is necessary to adjust the pipeline, it is necessary to ensure that the original design function remains unchanged, and the individual pipelines with little impact are adjusted to ensure that the adjustment should be easy to install, maintain, and manage.

2. Some installation, avoidance and maintenance issues should be considered when piping layout. If you want to rationally lay out all the large pipelines occupying the top space such as water supply and drainage and fire fighting pipes, strong and weak bridges, so that they can be designed under the premise of ensuring that they can meet the use, without changing the design, and fully considering various factors affecting the pipeline .

3. The principle of avoidance should be paid attention to whether it is an exposed PPR pipe or a buried pipeline. Among the avoidance principles, the cold water pipe avoids the hot water pipe. This is what you need to pay attention to in the home improvement hot and cold water supply pipe.

Also pay attention to various pressure pipes, non-pressure pipes, small pipelines to large pipelines, pipelines with few accessories to avoid pipelines with many accessories, and temporary pipelines to avoid permanent pipelines. These need to be noted and clearly stated during installation and design.